Team Lead Installation Technician at Peyton Resource Group
Dallas, TX 75215
About the Job
Great Opportunity with 80% travel requirements!
Must live near a major airport!
SUMMARY
- This position manages all aspects of installation and industry standard testing & troubleshooting, related to company products and their function within the SAN and Enterprise data center environment.
- Acts as company Liaison in accordance with established data center procedures and policies of our customers.
- Ensures maximum quality, peak performance, and reliability of all fiber optic cabling within a data center environment.
- This position will be responsible for multiple assigned installation projects, with multiple technicians of different technician levels.
- Adhere to drawings, scope of work and company standards for all portions of customer installations, new builds and/or retrofits.
- Manage, audit, and enforce established project procedures and policies within the day-to-day management of installations.
ESSENTIAL DUTIES AND RESPONSIBILITIES
- Responsible for successful implementation of all aspects of complex fiber optic infrastructure installation projects.
- Implement and maintain workmanship and best practice standards and Fiber Optic Testing Procedures (FOTP) during all installations.
- Maintain detailed site documentation including floor plans, elevations, labeling documents, plug charts and cut sheets.
- Coordinate all installation activities in assigned Data Centers with our management and support leadership in continual improvement of implementation policy, standards, and procedures.
- Monitor, communicate, and perform corrective actions to resolve problems affecting the fiber related infrastructure.
- Record and document fiber installations including cable routing, central, zone and equipment footprints and elevations.
- Coordinate, review, and schedule with other internal departments all pre and post installation procedures and documentation.
- Perform quality control inspections during installation.
- Responsible for all aspects of cable removal activities.
- Reporting project completion status after each workday, as well as ensuring that paperwork and test results are uploaded in the Installation folder within three days of project completion.
- Ability to configure and install structured cabling and cable management systems to meet customer requirements and adhere to air-flow requirements as well as cable management standards. This includes racks, cabinets and bays and proper tile cut designs and raised floor grommet systems used.
EDUCATION AND EXPERIENCE
- Minimum of (3) three years related experience and/or training.
- Experience leading multiple technicians over multiple projects is preferred.
- Data Center experience is preferred.
OTHER SKILLS AND ABILITIES PREFERRED
- Excellent working knowledge of fiber optics and fiber optic test equipment, including Fluke Tester and Scope.
- Minimum of (2) two years’ fiber optic installation or assembly experience in a Data Center environment.
- Understanding of fiber optic installation and testing standards as well as design layout best practices.
- Ability to use Fluke Network equipment as required to test and document installations.