Project Engineer - NR Consulting LLC
Irvine, CA 92618
About the Job
Role: Project Engineer
Duration: 12 Months
Location: Irvine, CA
Roles and Responsibilities Summary:
The Failure Analysis Report (FAR) requirements are flowed down to client from Gulfstream (GAC) via Purchase Order (PO), and 100% of all client component removals that GAC suspected to be the cause of the aircraft level failure are received with a FAR requirement on the PO.
The purpose of the FAR is to correlate the client's findings to the aircraft level failure mode and determine if there are any failure trends that may require corrective action.
The Project Engineer will drive the FAR work and manage the master FAR tracking working with individual engineers/technicians and focal points and GAC program managers within the SSO (Service Support Operations) and CFCD (Commercial Flight Control division) divisions. The Project Engineer will also follow up activities and logistics to have the individual SN FAR's/project closed.
FARs are submitted via Seller Engineering Memo (SEM) to Gulfstream Aerospace Corporation (GAC) for the client's Bill of Materials that include over 48 Part Numbers (PN). The components shown in Table 1 attached are examples of the Bill of Material.
To help manage the project and correlate the client's findings to the aircraft level failure mode, the individual needs to understand basic knowledge of electronics, hydraulic operation, EHSV operational basics, and G650, G500/G600 system architecture.
Currently there are over 400 Mechanical and Electronical FAR's open. On average 15 new parts and inducted and turn to an open FAR.
Candidate should have project management experience and skills.
Scope of Work:
The individual will need to:
•Manage and control the Master FAR tracker (including top assemblies and its subparts that require FAR
•Interface with GAC customers
•Be accountable to agreed metrics and plan with GAC considering FAR burndown
•Interface with engineer specialists to report and follow up FAR progress activities
•Interface with program managers to prioritize FARs on units that are needed to prevent AOG situations
•Access repair shop database (R-Card), interpret the test findings and failure observations noted on the database and on the test data sheet, and extract relevant information to update FAR tracker
•Interface with the Materials and Processes lab to follow up lab evaluation requests and have general knowledge to understand the findings
•Collect, organize, and interpret all client's component test results, failure observations. SIL testing, engineering directed testing, and lab analysis to be loaded in the FAR tracker
•Eventually submit individual FARs to GAC via SEM. SEM will contain FARs per the GAC approved format to present and correlate the findings as they relate to the aircraft level fault. FARs will be written by engineer specialist(s)
•Work is to be performed in the Customer Support Engineering office in Irvine
•Business travel may be required when interfacing with Savannah, Ogden or Dublin engineers/repair stations. Length of travel may be up to 5 days in duration.
Duration: 12 Months
Location: Irvine, CA
Roles and Responsibilities Summary:
The Failure Analysis Report (FAR) requirements are flowed down to client from Gulfstream (GAC) via Purchase Order (PO), and 100% of all client component removals that GAC suspected to be the cause of the aircraft level failure are received with a FAR requirement on the PO.
The purpose of the FAR is to correlate the client's findings to the aircraft level failure mode and determine if there are any failure trends that may require corrective action.
The Project Engineer will drive the FAR work and manage the master FAR tracking working with individual engineers/technicians and focal points and GAC program managers within the SSO (Service Support Operations) and CFCD (Commercial Flight Control division) divisions. The Project Engineer will also follow up activities and logistics to have the individual SN FAR's/project closed.
FARs are submitted via Seller Engineering Memo (SEM) to Gulfstream Aerospace Corporation (GAC) for the client's Bill of Materials that include over 48 Part Numbers (PN). The components shown in Table 1 attached are examples of the Bill of Material.
To help manage the project and correlate the client's findings to the aircraft level failure mode, the individual needs to understand basic knowledge of electronics, hydraulic operation, EHSV operational basics, and G650, G500/G600 system architecture.
Currently there are over 400 Mechanical and Electronical FAR's open. On average 15 new parts and inducted and turn to an open FAR.
Candidate should have project management experience and skills.
Scope of Work:
The individual will need to:
•Manage and control the Master FAR tracker (including top assemblies and its subparts that require FAR
•Interface with GAC customers
•Be accountable to agreed metrics and plan with GAC considering FAR burndown
•Interface with engineer specialists to report and follow up FAR progress activities
•Interface with program managers to prioritize FARs on units that are needed to prevent AOG situations
•Access repair shop database (R-Card), interpret the test findings and failure observations noted on the database and on the test data sheet, and extract relevant information to update FAR tracker
•Interface with the Materials and Processes lab to follow up lab evaluation requests and have general knowledge to understand the findings
•Collect, organize, and interpret all client's component test results, failure observations. SIL testing, engineering directed testing, and lab analysis to be loaded in the FAR tracker
•Eventually submit individual FARs to GAC via SEM. SEM will contain FARs per the GAC approved format to present and correlate the findings as they relate to the aircraft level fault. FARs will be written by engineer specialist(s)
•Work is to be performed in the Customer Support Engineering office in Irvine
•Business travel may be required when interfacing with Savannah, Ogden or Dublin engineers/repair stations. Length of travel may be up to 5 days in duration.
Source : NR Consulting LLC