Data Center Construction General Superintendent - Pkaza
Boston, MA 2212
About the Job
Senior Mechanical Engineer - Boston, MA
This opportunity is a chance to work for a leading data center company and not your typical consulting role. The ideal candidate will have past experience designing commercial HVAC mechanical systems specifically for cooling mission critical data center computer rooms. They will have experience with heating and cooling load calculations, ductwork and piping sizing, selecting HVAC equipment, energy modeling and other engineering calculations.
Responsibilities:
- Manage projects, create designs and plans, provided and gather specifications
- Execute assignments in a multidisciplinary mechanical engineering design role for complex facility design projects
- Equipment sizing and calculations
- Coordination with all trades, including architectural, structural, and civil
- Create Conceptual Designs
- Oversee Commissioning Process as needed
- Represent the company in project meetings
- 5-10 years of experience designing data center cooling systems
- Bachelor's Degree in Mechanical Engineering
- PE a plus; LEED a plus
- Experience working with Mechanical Systems ( HVAC, CFD (Fluid Dynamics), Boilers, Chillers, Pumps, CRAC / CRAH Units, Air Handling Units, etc.
- Technical writing experience and proficiency
- Proficiency in MS Office products, including Word, Excel, Outlook and Project
- Experience reviewing work in REVIT; Trane Trace or IES VE Energy Modeling software
- Strong interpersonal/communication skills needed for client interface
- Previous experience in the Military / Military veterans in all branches that have experience with Electrical / Mechanical is a huge plus (Navy Nukes- EMN, ETN, MMNs, Seabees, Army - Power Generation, Air Force – Power Production, Generator Techs, Maritime, Coast Guard, etc.)
Submittal Instructions:
Please apply directly by clicking the link below, alternatively you can forward your resume directly to: m45jxnqsqmbhfkc1epm7khap3o@crelate.net
After applying, if you have further questions, you may call 973-895-5200 and ask for Iggy. You can also submit via our career portal and take a look at other Critical Facility openings we are working on at, https://www.pkaza.com/jobs/
If this job is not for you, feel free to forward this along. WE PAY FOR REFERRALS!!
Company offers competitive salaries and benefits package including medical insurance, a 401(k) plan
EOE/AA Employer M/F/D/V
Pkaza LLC is a third-party employment firm. All fees assessed by Pkaza LLC will be paid by our employer that we represent and not by the candidate